Company Profile

Nan Ya Plastics Industry (Zhengzhou) Co., Ltd. is a major plastic pipe manufacturing base established by Taiwan’s Formosa Plastics Group in Zhengzhou, Henan Province, China. The facility covers approximately 8 hectares (19.8 acres) and represents a total investment of US$20 million. Construction began in September 2004, and commercial production commenced in March 2007. Today, the facility operates 16 automated production lines with an annual production capacity of 42,000 metric tons, making it one of the leading plastic pipe manufacturing bases in central China. Nan Ya’s experience in pipe manufacturing dates back to 1958. Our product portfolio includes five main categories—PVC, PE, PP-R, PPH and PE-RT—with diameters ranging from 20 mm to 630 mm. These products are widely used in potable water supply, building services, landscaping, municipal infrastructure and chemical processing. Guided by our core values of diligence and pragmatism, pursuit of excellence, sustainable operations and contribution to society, we are committed to delivering reliable products and responsive service to customers and partners.

Service Philosophy

Certification&Awards

Our History/Milestones

2026

Develop industrial pipe φ400-φ500

2025

Add a feeding robotic arm

Add PPH pipe material

2022

In April, a PVC small-diameter production line from KraussMaffei of Germany was added

2021

In September, we added a medium-caliber production line from KraussMaffei PPR in Germany

2020

In November, a medium-to-large caliber PVC production line was added

2017

In June, the PVC medium-caliber production line from Battenfeld-Coster of Germany was added

2015

In June, we developed new industrial tubes with specifications ranging from 20 to 400

2012

In November, three KraussMaffei PE production lines were added

2010

In August, two production lines for PE-RT and PP-R pipes were added

In December, a KraussMaffei large-diameter production line was added

2007

In March, the construction of the factory area was completed

On March 1st, the first pipe was rolled off the production line

On March 15th, the first batch of pipe materials was sold and shipped out of the factory

2005

On January 21st, construction of the pile foundation structure of the main factory building began

On March 13th, a groundbreaking ceremony for the construction of the main factory building was held

2004

In July, the original terrain of the factory site began to be backfilled and leveled

2003

October 12th Company registration


Installation Video